Grid tariff reform AgNes: what changes for your site? Check now →

Offer 2026–2028

§19/AgNes check

Request this

The check covers 2026, 2027 and 2028. In that window it is decided whether an individual grid fee under § 19 StromNEV can be carried into the AgNes transition. The Federal Network Agency’s draft ties that protection to an agreement at the end of 2028 and to the conditions having been met at least once in 2026 to 2028. That is draft status, not a decision. Sources are in the AgNes series (German).

What the check includes

A fixed-scope analysis, then monitoring. We look at the load profile, the high-load windows, the existing grid-fee contract and the storage or shiftable load that can hold the window. The aim is to secure protection of the existing arrangement where the draft provides for it, and to move from there into a storage or flexibility project. That project is the EMS: peak shaving and the capacity charge. White label only if a partner is involved.

Meant for mid-sized sites with about 2.5 to 25 GWh a year and PV plus storage from about 100 kWh to 3 MW. Smaller households without a capacity charge are not the core.

What we do not promise

No guarantee that a § 19 discount survives. In the sources we cite, AgNes is a draft decision. The Federal Network Agency put it out for consultation on 6 August 2026, comments were due by 18 September 2026, and adoption was intended for the end of 2026.

How it starts

A request, a reply within one business day, then the papers: load profile, contract, meters, storage. The analysis says whether 2026 to 2028 is an issue and which lever comes next, control or supply.

Alongside it: consulting on metering and energy supply if residual power should move with the project.

Common questions

Has AgNes already been adopted?

Not in the sources we cite. There is a draft decision, consulted until 18 September 2026. The check uses that status and will be updated after a decision.

Does the check secure the § 19 discount?

It checks whether the conditions for the protection described in the draft are within reach, and it leads into a storage or flexibility project. The page states no guarantee.

Who is it for?

Mid-sized sites with about 2.5 to 25 GWh a year and PV plus storage from about 100 kWh to 3 MW, where the capacity charge and § 19 matter.

Request the check

Name and email are enough. We reply within one business day.

Ready for your next
energy project?

Consulting, energy management or power supply – we will get back to you within one business day.

Rafail Kasapis
Your contact
Rafail Kasapis
Managing Director
Contact

How would you like to talk to us?

Your details
Please choose a day

Write to us

We reply within one business day.