AgNes grid charge reform: what changes for commercial sites
Germany's Federal Network Agency is restructuring grid charges. What AgNes means for commercial sites and how you can prepare now for the new system.
In short: From 1 January 2029, the Bundesnetzagentur (Federal Network Agency, BNetzA) will replace the existing Electricity Network Charges Ordinance with a new system, known as AgNes. Under the current draft, the existing capacity charge will be abolished for commerce and industry. It will be replaced by a capacity price on a self-selected level of power, plus two energy charges – a significantly more expensive one for everything above the selected level of power. Those who know their load profile and can control peaks will be at an advantage. The determination is not yet final.
What AgNes is and when it applies
AgNes stands for “Allgemeine Netzentgeltsystematik Strom” (General Electricity Grid Charge System). Background: the StromNEV (Stromnetzentgeltverordnung, Electricity Network Charges Ordinance) ceases to apply after 31 December 2028. The BNetzA must therefore set the rules for grid charges itself – and is using this for a fundamental reform.
The timetable according to the BNetzA:
- May 2026: presentation of the interim status with a background paper
- 6 August 2026: draft determination published for consultation (comments until 18 September 2026)
- End of 2026: planned determination
- 2027: follow-up determinations setting out the details, including a separate methodology for special grid charges for energy-intensive industry (consultation planned for the second quarter of 2027)
- 1 January 2029: the new rules apply.
Everything that follows describes the status of the draft of August 2026. Details may still change before the determination is adopted.
What changes for commerce and industry
Today, customers with interval load metering (RLM) pay an energy charge per kilowatt hour and a capacity charge per kilowatt of their highest quarter-hour in the year. A single peak therefore determines the costs for the whole year.
Under the draft, the capacity charge will be abolished in 2029. The new model has three components:
| Component | What for | What the draft provides |
|---|---|---|
| Capacity price (KP) | a self-selected (“booked”) level of power, in €/kW per year | at least 10 % of the customer’s own annual peak load in the previous year, at most the agreed grid connection capacity |
| Energy charge 1 (AP1) | electricity drawn within the booked power | regular energy charge |
| Energy charge 2 (AP2) | only the kilowatt hours that exceed the booked power in a given quarter-hour | 200 to 350 % of AP1 |
According to the draft, the BNetzA does not intend to introduce dynamic, i.e. short-term fluctuating, grid charges for end customers for the time being.
What this means in practice
In future, companies will have to make a decision that they do not face today: What level of power do we book?
- Booked too high: the capacity price is paid for power that is hardly used.
- Booked too low: every quarter-hour above the booked power is billed at two to three and a half times the energy charge.
A single outlier will therefore no longer cost the whole year, as it does today, but frequent exceedances will become expensive. How strongly this affects your costs depends on your load profile and on your grid operator’s future prices. These prices will only be set after the determination.
Load peaks remain a cost factor
Even without a capacity charge, it is worth smoothing load peaks. Those who reliably limit their peaks can book a lower level of power and avoid expensive AP2 volumes. This requires:
- Metering data at quarter-hour resolution, to know your own load profile
- Forecasts, to anticipate peaks
- Control that shifts consumers or discharges a battery storage system before the booked power is exceeded
This is exactly what an energy management system with peak shaving does.
§ 19 StromNEV: what happens to special grid charges
Many industrial companies currently pay reduced grid charges under § 19 StromNEV:
- Atypical grid usage: the company’s own peak load falls outside the grid operator’s peak-load time windows.
- Intensive grid usage (“baseload”): very steady, high consumption throughout the year.
With the end of the StromNEV, the legal basis ceases to exist. The draft provides for transitional rules:
- Atypical grid usage: the rule remains applicable until 31 December 2031 for final consumers who have a valid individual grid charge agreement under this rule as at 31 December 2028.
- Baseload: according to the interim status of May 2026, the existing rule is to continue to apply to existing customers until the end of 2031 if their average annual consumption from 2024 to 2027 exceeds 10 GWh.
- Energy-intensive industry: the future special grid charge will be governed by a separate determination.
Important for the transitional years: anyone wishing to benefit from grandfathering must continue to meet the requirements until then. If a battery storage system or flexibility is newly marketed, the load profile may change in such a way that the conditions under § 19 are no longer met. According to the assessment of law firms, an exemption granted by the BNetzA for flexibility (BK4-22-089) is not explicitly extended in the draft. Flexibility marketing and § 19 should therefore be planned together.
Battery storage under AgNes
For storage systems, the BNetzA envisages a separate approach:
- New storage systems will pay a capacity price from 2029, but no energy charge. Based on the draft, trade media cite an order of magnitude of around 4 to 7 €/kW per year.
- Existing storage systems will only be included once the grid charge exemption under § 118(6) EnWG (Energy Industry Act) has expired. According to the BNetzA itself, it has dropped its original plan to charge all existing storage systems from as early as 2029.
According to the interim status, generation plants are also to pay a capacity price in future; existing plants are protected for 20 years from commissioning, and plants below 30 kW are exempt.
What companies should do now
- Analyse your load profile: evaluate quarter-hourly values for the last two to three years – base load, peaks, frequency of outliers.
- Calculate booking scenarios: use the draft rules to model how the capacity price, AP1 and AP2 work out at different levels of booked power.
- Secure your § 19 status: review existing agreements and document fulfilment of the requirements without gaps until 2028.
- Plan flexibility, but in a coordinated way: design battery storage, load shifting and marketing so that they do not jeopardise § 19.
- Monitor the determination: wait for the final rules (planned for the end of 2026) and the grid operators’ price sheets for 2029 before firmly costing major investments.
Apollo advises SMEs and industry on § 19 StromNEV and the transition to AgNes, and provides support with metering data, load profile analysis and an energy management system built on its own hardware and software that limits peaks and controls battery storage. Find out more about our consulting – or contact us directly.
Frequently asked questions
When does AgNes apply?
The new rules are due to apply from 1 January 2029. The determination is planned for the end of 2026, with further details to follow in 2027.
Will the capacity charge really be abolished?
According to the draft of August 2026, yes. It will be replaced by a capacity price on a self-selected level of power and two energy charges.
Is peak shaving still worthwhile under AgNes?
Yes, just in a different way. Instead of a single annual peak, all quarter-hours above the booked power will count in future. Those who reliably limit peaks can book a lower level and avoid the expensive energy charge 2.
Will I lose my atypical grid usage status?
Not immediately. Under the draft, the rule remains applicable until the end of 2031 if a valid agreement is in place as at 31 December 2028. The requirements must continue to be met until then.
What does AgNes mean for a planned battery storage system?
New storage systems are to pay a moderate capacity price from 2029, but no energy charge. Profitability should be calculated using these draft rules and with § 19 in mind.
Sources
- Bundesnetzagentur: Festlegungsverfahren AgNes (GBK-25-01-1#3) (German)
- Bundesnetzagentur: Pressemitteilung vom 06.08.2026 – Konsultation zur Reform der Netzentgeltsystematik Strom (German)
- Bundesnetzagentur: Festlegungsentwurf AgNes (PDF) (German)
- Bundesnetzagentur: Pressemitteilung vom 27.05.2026 – aktuelle Überlegungen zur Reform (German)
- Bundesnetzagentur: Orientierungspunkte Industrienetzentgelte, April 2026 (PDF) (German)
- pv magazine: Lastspitzenkappung unter AgNes: Ohne Leistungspreis relevanter denn je? (15.09.2026) (German)
- Raue: AgNes – Übergangsregelung für individuelle Netzentgelte stromintensiver Unternehmen (German)
As of November 2026, based on the draft determination of August 2026. The final determination may differ. This article does not constitute legal advice.