Peak shaving with battery storage for businesses: how it pays off

A single load peak can determine grid charges for a whole year. How peak shaving with battery storage works and how to calculate the savings for your site.

In short: Commercial and industrial customers with load metering currently pay a capacity charge on their highest quarter hour of the year. A battery storage system that discharges exactly when a peak is imminent lowers this annual peak load – and with it the grid charges. The savings can be calculated in advance from the load profile. What matters is the right sizing and a control system that does not miss a single peak.

Why a single peak is so expensive

Customers with interval load metering (RLM) – mandatory from an annual consumption of 100,000 kWh – pay grid charges made up of two parts:

The capacity charge therefore depends on a single metered value. If compressors, furnaces and ventilation start up simultaneously on a cold Monday morning, that one quarter hour can set the costs for the entire year – even if demand is significantly lower on all other days.

The 2,500-hour threshold

For RLM customers, grid operators publish two pairs of prices, depending on the full-load hours (annual consumption divided by annual peak load):

For businesses with many full-load hours, the capacity charge is therefore the biggest lever. Important: peak shaving lowers the annual peak load and thus increases the full-load hours. Anyone just below 2,500 hours may slip over the threshold. Both pairs of prices therefore belong in every calculation. The values can be found in your grid operator’s price sheet.

How peak shaving with storage works

The principle is simple: the storage system discharges as soon as the load exceeds a defined limit and covers the portion above it. The grid then only sees the limit. In quiet periods, the storage system recharges.

In practice, everything depends on three things:

  1. Setting the limit correctly: too high, and the savings are small. Too low, and the storage system is empty before the peak is over.
  2. Having the storage system full in time: before expected peaks, there must be enough energy in the storage system. This requires forecasts for load and – with PV – generation.
  3. Not missing a single peak: just one quarter hour above the limit sets the capacity charge for the year. The control system therefore needs safety margins and a plan B, such as briefly switching off flexible loads.

Calculating the savings: an example

A simplified example with assumed values – the actual prices can be found in your grid operator’s price sheet:

Assumption
Current annual peak load400 kW
Full-load hoursover 2,500 h, even after peak shaving
Capacity charge120 € per kW and year
Target limit320 kW

Savings on the capacity charge: (400 kW − 320 kW) × 120 €/kW = 9,600 euros per year.

This must be weighed against the investment in and operation of the storage system. The calculation improves if the storage system performs several tasks (see below).

Sizing the storage system

Two parameters count for peak shaving:

The basis for this is the load profile: the quarter-hourly values of the last one to three years. From these, you can read how often the load is above a possible limit, for how long and by how much. A simulation over the whole year shows which combination of limit, power and capacity pays off. Added to this are efficiency, a reserve for unexpected peaks and battery ageing.

There are many rules of thumb on the market. Only a simulation with your own data is reliable.

More value through multiple use

A storage system that only shaves peaks on a few days a year stands idle most of the time. It becomes more economical if it also:

The order of priority is important: the reserve for peak shaving takes precedence. An energy management system plans how much capacity remains available for which task.

Outlook: peak shaving under AgNes

From 2029, the Bundesnetzagentur (Federal Network Agency, BNetzA) will replace the current grid charge system with AgNes. According to the current draft, the capacity charge will be abolished. Instead, companies book a capacity, and every quarter hour above this capacity is billed at a significantly higher energy charge.

Peak shaving therefore remains worthwhile, but changes its character: instead of avoiding a single annual peak, the aim is to reliably stay within the booked capacity. A storage system designed for peak shaving today should already take this logic into account.

Caution with § 19 StromNEV

Businesses with reduced grid charges under § 19 StromNEV (Electricity Network Charges Ordinance) should check every change to their load profile. A storage system that also trades on the electricity market can change the profile in such a way that the requirements for atypical or intensive grid use are no longer met. Peak shaving and § 19 can be combined, but only if both are planned together.

What Apollo takes care of

Apollo analyses the load profile, simulates the limit and storage size and controls the storage system with its own hardware and software: forecasting, peak shaving, self-consumption and arbitrage in one energy management system. We also advise on § 19 StromNEV and AgNes – so that peak shaving today and the rules from 2029 fit together.

Frequently asked questions

How much does peak shaving save?

The savings on the capacity charge are the shaved power in kilowatts multiplied by your grid operator’s capacity charge. With high full-load hours, the capacity charge is usually high, so peak shaving pays off most there.

What happens if the storage system misses a peak?

Then that peak counts as the annual peak load, and the savings for the year are largely lost. This is why forecasting, a safety reserve and a plan B for flexible loads are so important.

How large does the storage system need to be?

The power depends on how much is shaved off, the capacity on the duration of the peaks. Both result from the simulation with your load profile, not from a rule of thumb.

Does peak shaving also work without storage?

Partly: through load management, i.e. shifting or briefly switching off loads. A storage system makes peak shaving less dependent on operational processes.

Is a storage system still worthwhile if the capacity charge is abolished in 2029?

According to the AgNes draft, yes, with a different logic: instead of the annual peak, every quarter hour above the booked capacity will then count. Plan the control system so that it can do both.

Sources

As of November 2026. The example values are assumptions; your grid operator’s price sheet and your load profile are authoritative. This article does not replace legal advice.